Heavy Transport - 600 Tons get stuck | High Girder Bridge
Published at : 23 Dec 2025
A 95 meters long and overall 592 tons heavy formation transported a 260 tons heavy transformer from Leer to a distribution station near Conneforde, Germany. For this, the High Girder Bridge of the Kahl Heavy Haulage corporation was applied. The transformer came by a barge on the Ems river (https://youtu.be/_XOj5PBG51I).
*This is part 2 of a threepart series about the transformer transport from Leer to Conneforde:*